BGMEA Membership Requirment



COMPLIANCE CHECK LIST FOR BGMEA MEMBERSHIP

1.      
No. of Toilet  (Floor Wise)
(01 toilet/25 persons)
:
Male:              Female:          Total:
2.      
Stair Cases with width  (Min. 45” width, inside to inside )
:
1)                    2)
3.      
Fire Evacuation Plan/No Smoking/Fire Service Number Displayed
:
Yes                  No
4.      
Floor Marking ( at least 36” & blockage free)
:
Yes                  No
5.      
Fire Extinguisher
(2 nos/1000 sft and  4-5 extinguishers should be  outside of the entrance)
:
Total:
6.      
Fire Fighting Equipments
:
Fire Alarm/ Gong Bell/ Smock Detector / Gas Mask (at least 3 pairs)/Fire Bitter /Fire Dress/Hand Gloves (at least 6 pairs)/Helmet/Fire Boot/ Lock Cutter(48”)/Fire Hook/ Manilla Rope(2” dia & 200 feet)) / 4 Fire Buckets with stand/ Water Drum/Fire blanket/Torch Light/ PA System /Battery Operated Mega Phone/Stretcher etc.
7.      
Electrical Main Switch is located at outside of the factory
:
Yes                     No
8.      
02 Fire Hose Reels with standby pump (100 feet/10,000 sft)

Yes                     No
9.      
Dedicated Water Reservoir available (2 thousand gallon for each floor on rooftop and 20 thousand gallon underground)
:
Yes                     No
10.  
Fire Drill conducted
:
Yes                      No
11.  
Fire Fighting Team (at least 18%)
:
Yes                      No
12.  
Emergency Light provided in floor
:
Yes                      No
13.  
Emergency Light provided in staircases
:
Yes                      No
14.  
Electrical Installation found in Bonded Area?
(N.B. There should not be any electrical installation in bonded warehouse)
:
Yes                      No

15.  
Electrial Wire are concealed in the wall
:
Yes                      No
16.  
Pure Drinking Water Provided
:
Yes                       No
17.  
Child Care Room & Doctors’ Room
:
Provided                   Not Provided
18.  
Lunch Room/Dining Space
:
Provided                   Not Provided
19.  
Exhaust Fan
:
Sufficient                   Not Sufficient
20.  
First Aid Box with sufficient medicine
:
Yes                               No
21.  
Boiler Setting (with boundary)
:
Properly                    Not Properly
22.  
Minimum Wages & OT are paid as per Labor Laws
:
Yes                             No
23.  
Tin Shade atop the factory roof
(N.B.There must not be any tin shade on factory roof)
:
Yes                             No
24.  
Generator found in the upper floor
:
Yes                           No
25.  
BGMEA Service Book Available?
:
Yes                             No



Requirement for BGMEA's Regular Membership


N.B.    All documents should be submitted in 02 sets, attested by Managing Director of the factory and Lien Bank.

1.              
Application in Letter head pad for BGMEA Regular Membership
2.              
Withdrawal of undertaking (if any).
3.              
Workers Group Insurance.
4.              
Bond Licence.
5.              
BGMEA Provisional Certificate.
6.              
Bill of Entry of Machinery.
7.              
ERC.
8.              
IRC.
9.              
TIN Certificate.
10.         
VAT Certificate.
11.         
Updated Fire Licence.
12.         
EPB Licence.
13.         
Factory Licence.
14.         
Approved Factory Layout Plan.
15.         
Documents as per undertaking (if any).
16.         
Implementation of compliance requirement.



Requirements for BGMEA Provisional Membership

Enclose: -        1.         D.D.: Tk.40, 500(for 80 to 100 m/c)/ Tk. 42,500 (for 101-200 m/c)/Tk. 47,500 (for over 200 m/c) in favor of "BGMEA Dhaka" (From any bank)
                 2. Duly Filled up BGMEA Application Form & an Application in letter head pad for Provisional Membership
                 3.     List of Specimen Signature,  National ID Card  & Photo (2 copies each) of all Shareholders/Directors attested by Lien Bank.
                 4.     Registration from Board of Investment/Textiles Dept. –BOI (Full set)/Textile Dept./BEPZA Permission in case of EPZ
                 5.     Commercial Invoice(s), L/C & Bill of Entry of Machinery Imported
                  6.   VAT Challan in case of locally procured Machineries along with Bill of Entry & LC Copy of the importer                                                                                                   
                 7.     Memorandum & Articles of Association (Sealed & Signed copy) along with Incorporation Certificate (if limited)/ Partnership Deed (In case of Partnership)/TIN Certificate (in case of Proprietorship)/ Form- 12 & 117 of Joint Stock Company & Amended copy of Board of Investment  in case of Share Transfer.
                      8.       i) NoC from Customs Bond Commissionerate, if there was another bonded factory in the same venue &   ii)  NoC from the owner of the previous factory
                 9.     i) Trade License ii) Fire License  iii) Soil Test Report iv) TIN Certificate
                 10.   Deed of Rent Agreement / Purchase Deed/Lease Agreement in case of EPZ     
                 11.   Factory lay-out Plan (Approval from Dept. of Inspection of Factories & Establishment)/Factory License
                 12.   i)Declaration of Two Stairs & ii) An Undertaking regarding Free from Child Labor                  iii) Undertaking regarding  Factory Roof Top without Tin Shade
                 13.   Approved building Plan from CDA/BSIC/Cantonment Board/Respective Authorities/BEPZA/ Letter of Permission/BEPZA Approval Letter of Architectural Drawings   (Factory must be in the Industrial/Commercial Building)
                 14. Structural Design/Drawings done by an Engineer having IEB (Institution of Engineers, Bangladesh) Professional Membership. (All pages of photocopy must duly be signed by Structural Engineer)
                 15. Certificate regarding Structural Design by IEB/Certified Company Registered Engineer to the effect that the building has been constructed as per design and specifications.
                 16. TK. 10,000 as donation for BGMEA School, Chittagong deposited to BGMEA School Account No: 06913100001451, Any Branch of EXIM Bank Ltd., Chittagong.

N.B.:
1) All copies should be submitted in (02) Two sets, duly attested by the Lien Bank & Managing Director of the Factory
2) The file shall not be processed in case of any shortage of the documents




Requirements for BGMEA Associate Membership
(Buying House)

01.       Demand Draft of BDT. 40,000 in favor of “BGMEA, Dhaka” from any schedule Bank.

02.      Duly filled up BGMEA Application Form & an Application in letter head pad for     BGMEA Associate Membership.

03.       Photograph of all Share holders / Partners / Proprietors (04 copies each and attested by lien bank)

04.      National ID card & Specimen Signature of all Shareholders / Partners / Proprietors (attested by Lien Bank)

05.       Photocopy of Passport (If available)

06.       Photocopy of Trade License.

07.       Photocopy of TIN Certificate.

08.       Photocopy of Memorandum of Articles of Association / partnership deed as applicable.

09.       Bangladesh Bank Clearance (if available)

10.       Work permit from Ministry of Industries for the Liaison office having 100% foreign investment.

11.       Deed of Office rent agreement / Purchase Deed.

12.       List of Employee (SL – Name – Designation)

13.       BDT. 10,000/- Deposit to BGMEA School Account, A/C No: 06913100001451, Any Branch of EXIM Bank Ltd., Chittagong as donation for BGMEA School, Chittagong.


N.B.:

1)     All copies should be submitted in 02 (two) sets, duly attested by Lien Bank
2)     A separate and full fledged official set-up is a prerequisite for being eligible for BGMEA Associate Membership 




Requirements for Extension Purpose

1)      Factory layout plan / Approval from CDA/BSIC/ Respective Authority
2)      Structural Design
3)      Approval from Board of Investment –BoI for extension
4)      Deed of Rent Agreement
5)      Updated Fire License
6)      BGMEA Membership Certificate


Requirements of Docs for Shifting of  Factory

1)     BGMEA membership renewal fees (If required)

2)     (a) Factory layout plan (approved by Dept. of Inspection of Factories & Establishment). (New address)
      (b) Factory License. (New address)

3)     (a) Approval of the factory building plan from CDA/BSIC/Cantonment Board/Respective Authority. (New address)
     (b) Letter of Permission

4)      Structural Design/Drawings done by IEB registered engineer (New address)

5)     Certificate regarding structural design by the IEB registered engineer

6)     Amendment copy from the Board of Investment for the shifting of the factory (New address)

7)     Amended list of new shareholders (if any) with 02 copies of photographs and relevant documents (Form 12 & 117) and Memorandum & Article of Association along with Incorporation Certificate

8)     (a) Updated Fire License (b) Trade License (c) ERC & IRC (d) TIN & VAT certificate (New address)

9)     BGMEA Membership Certificate

10) Deed of Rent Agreement / Purchase Deed of new venue











                      Requirement For Bonded Warehouse


01)   ‡Kv¤úvbxi †cÖvdvBj|
02)   ‡g‡gv‡iÛvg GÛ AvwU©‡Kj Ae G‡mvwm‡qkb I mvwU©wd‡KU Ae BbK‡cv©‡ikb|
03)  cÖ¯—vweZ ¯’v‡b c~‡e© †Kvb eÊ cÖwZôvb ¯’vwcZ wQj bv g‡g© †NvlYvcÎ|
04)   wj‡qb e¨vsK KZ…©K eÊv‡ii bgybv ¯^v¶‡ii mZ¨vwqZ Kwc|
05)  wkï kªwgK wb‡qvM Kiv n‡e bv g‡g© †NvlYv cÎ|
06)   Kv÷g msµvš— KvMRcÎ I `wjjvw`‡Z ¯^v¶i cÖ`v‡b  g‡bvwbZ e¨w³i bgybv ¯^v¶i|
07) cwiPvjK gÛjx Ab¨ †Kvb cÖwZôv‡bimv‡_ RwoZ _vKv ev bv _vKv GB g‡g© †Nvlbv cÎ|
08)   mKj cwiPvjK I †kqvi †nvìviM‡bi AvBwU 10we m¤ú©wKZ A½xKvibvgv (150/- UvKvi ÷¨v‡¤ú)|
09)   cwiPvjK gÛjxi RvZxqZv mb`cÎ|
10)   wewRGgBGÕi m`m¨ c‡`i mvgwqK mb`cÎ|
11)   1,000/- UvKvi bb-Rywowkqvj ÷¨v‡¤ú ‡Rbv‡ij eÛ|
12)   KviLvbvi mvBU †j-AvDU c­vb|
13)   wewb‡qvM †ev‡W©i wbeÜb cÎ I mycvwik cÎ|
14)   g~j¨ ms‡hvRb Ki wbeÜbcÎ|
15)   AvqKi mb`cÎ|
16)   dvqvi mvwf©m jvB‡mÝ|
17)   †UªW jvB‡mÝ|
18)   AvB Avi wm|
19)   B Avi wm|
20)   e¨vsK Gi Avw_©K m”QjZv mb` cÎ|
21)  †P¤^vi Ae Kgvm© GÛ BÛvwóªÕi m`m¨ mb` |
22)   we`y¨r ms‡hv‡Mi cÖvgvb¨ `wjj|
23)   3,000/= UvKvi wU,Avi, Pvjvb|
24)   wmwKDwiwU eÛ UvKv-500/-|
25)   Avg`vbxK„Z †gwkbvixR Gi `wjjcÎ|
26)   mKj cwiPvj‡Ki bgybv ¯^v¶i|
27)   eÊ jvB‡mÝ msµvš— †Kv¤úvbxi †evW© wgwUs-Gi †iRywjDkb Kwc|
28)   e¨vsK ó¨vU‡g›U|
29)   evox fvovi Pzw³bvgvi Kwc|
30)   cÖ¯—vweZ ¯’vb †Q‡o hvIqvi 01 (GK) gvm c~‡e© AewnZ Ki‡eb g‡g© †hŠ_ †NvlbvcÎ|
31)   ißvbx msµvš— †NvlbvcÎ (150/- UvKvi bb-Rywowkqvj ÷¨v‡¤ú)|
32)   wj‡qb e¨vsK cwieZ©b, KviLvbv ¯’vbvš—i, gvwjKvbv cwieZ©b, †kqvi n¯—vš—i msµvš— †NvlYvcÎ|
33)  Kg©KZ©v/Kg©Pvixi ZvwjKv|
34)   Drcv`b m¤úwK©Z †NvlbvcÎ|
35)  wbav©wiZ di‡g Av‡e`bcÎ|
36)   KviLvbvi mb` cÎ|



                                          


No comments: